Engineer-Constructor Firm
Kyiv, Ukraine
+38 044 521 30 30
+38 050 331 07 03
© 2017 - vikstar.com.ua
Web design by - Site-pro.top
The construction of three townhouses was conducted in winter on the existing foundations without power- and water supplies on the construction site. The masonry of the outer walls of two-story houses was made of gas concrete blocks.